San Francisco Bay Area Architecture Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects San Francisco Bay Area Architecture Kappe+Du Architects Kappe+Du Architects San Francisco Bay Area Architecture Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects San Francisco Bay Area Architecture
Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects
Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects
Kappe+Du Architects
San Francisco Bay Area Architecture Kappe+Du Architects
Kappe+Du Architects
Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects
Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects
Kappe+Du Architects
      Kappe+Du Architects
* Jiane Du, Project Designer, while with Field Paoli Architects Kappe+Du Architects
San Francisco Bay Area Architecture Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects
An Innovative, Historically Sensitive Solution
Kappe+Du Architects

This is a modernization and redesign of a national historic structure and landmark that sat empty for over a decade. The 24,000 square foot site along Van Ness now incorporates two restaurants, 50 residential lofts, a health club, street-level retail properties, and a 14-screen movie theater. The design uses the existing historical context to deliver a balanced solution that both recognizes its roots and creates a dynamic mix of residential and commercial properties.

Key Project Considerations
Kappe+Du Architects
+ We hoped to find an architectural solution that could solve seismic issues facing the historical building without having to add frames which would obstruct the historical structure's windows, a key part of the existing architecture
San Francisco Bay Area Architecture
+ Provide for seven levels of underground parking beneath the modern addition
Kappe+Du Architects
+ Create a design that injects a welcome degree of dynamism and life, as well as addressing the city's residential and commercial needs
San Francisco Bay Area Architecture
Project Successes Achieved Through Design
Kappe+Du Architects
+ We retained the building's overall aesthetic by using drag-beams to transfer seismic loads from the historical structure to the modern addition
Kappe+Du Architects
+ We took special care in the design of the newer portion of the building's façade, resulting in a modern face of the building that echoes the existing historical context and costs dramatically less than a reconstruction of the entire historic façade
Kappe+Du Architects
+ The building's unique vertical integration of entertainment, housing, restaurants and parking provided a new prototype for development in San Francisco that both respects the city's historic past and creates safe, dynamic spaces for the future
Kappe+Du Architects
 
Kappe+Du Architects  
Kappe+Du Architects
Kappe+Du Architects Kappe+Du Architects Kappe+Du Architects
Kappe+Du Architects Kappe+Du Architects
Kappe+Du Architects